Description |
Air Diving to 160 ft, Mixed Gas Diving from 130 ft. - 300 ft., Saturation Diving to 1,000 ft, Underwater Video and Photography, Underwater Grit Blast, Sub-Sea Assembly Installation, Underwater Welding & Burning, Spud, Lay, and Derrick Barges, Platform Removal, Ultrasonics, Mag Particle, Hand-Jetting, Anode Installation, Grinding, Nondestructive Testing, Jet Sled Burial, Riser Removal, Site Surveys & Clearance, Inspection Reports, Cathodic Protection Installation, Riser Installation & Repair, Pipe Cutting, Pipeline Abandonment, Repair, Burial, and Location … ABS, Hull, Level II, III, & IV Platform … Plug & Abandonment, Lift Boat, Salvage Barge |